Section 11 : Schémas; Plan D'installation (10000010258 Rév B-1 / 2) - Generac 000209b Guide D'installation

Masquer les pouces Voir aussi pour 000209b:
Table des Matières

Publicité

Section 11 : Schémas
Plan d'installation (10000010258 rév B—1 / 2)
679
768
[26.8]
[30.2]
TRANSFER SWITCH
(IF SUPPLIED)
MAIN AC/CONTROL WIRING HOLE FOR 1 1/4" CONDUIT
MAIN AC/CONTROL WIRING HOLE FOR 3/4" CONDUIT
AUXILIARY SHUTDOWN SWITCH
WIRELESS MODULE
345
[13.6]
218
[8.6]
Guide d'installation des génératrices refroidies par air 60 Hz
HOLE LOCATIONS FOR
OPTIONAL MOUNTING TO
16 [5/8] DIA. CLEARANCE
10 [3/8] DIA. MASONRY ANCHOR
BOLTS RECOMMENDED
267
[10.5]
356
[14.0]
(
-REMOVE FACTORY PLUGS AND DISCARD
-CLOSE ANY UNUSED HOLE WITH A NEMA
3R RATED PLUG (FIELD SUPPLIED)
FUEL INLET : 1/2" NPT (9-11kW)
: 3/4" NPT (16-22kW)
REQUIRED FUEL PRESSURE : NATURAL GAS : 3.5-7" WATER COLUMN
LIQUID PROPANE (VAPOR) : 10-12" WATER COLUMN
REAR VIEW
MOUNTING TO CONCRETE PAD
A CONCRETE PAD
HOLE (3) PLACES,
FRONT OF UNIT
)
733
[28.8]
197
393
[7.7]
[15.5]
849
[33.4]
635
[25.0]
648
[25.5]
LEFT SIDE VIEW
Schémas
521
[20.5]
68
[2.7]
49

Publicité

Table des Matières
loading

Table des Matières