Télécharger Imprimer la page

Step 8: Connect Multiple Control Units - Optional; Special Mounting Considerations - Grafik Eye 4000 Serie Mode D'emploi

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 85
Step 8: Connect Multiple Control Units — Optional
If your lighting system has multiple control units, connect them using PELV (Class 2: USA) cabling as described here. 
Daisy-chain the PELV (Class 2: USA) cabling to terminal 1, terminal 2, terminal 3, and terminal 4 on all control units 
and wallstations.
WARNING! Make sure no bare wire is exposed after making connections. The recommended installation 
torque is 3.5 in.-lbs. (0.4 N•m) for PELV (Class 2: USA) connections.
System Maximums: Up to 8 Control Units and 16 Wallstations and 8 Shade Controllers
Power panel
A1
CU WIRE ONLY
SSA RTN
DO NOT USE
2 IN, OUT
USA
CLASS 2
1 IN, OUT
IEC
PELV
DO NOT USE
a
4
3
4
2
1
3
2
1
A2

Special Mounting Considerations

Wallbox Mounting and Spacing
When mounting multiple control units or interface devices, be sure to follow spacing requirements to ensure proper 
operation.
•  All control units MUST be mounted in a standard U.S. wallbox. (For 
mounting procedures, refer to page 7.)
•  Allow 1 in. (25 mm) for faceplate overhang on all sides.
R
SSA
A3
b
4
3
2
4
1
3
2
1
c
4
3
4
2
1
3
2
1
d
4
3
4
2
1
3
2
1
SSA
CU WIRE ONLY
SSA RTN
DO NOT USE
2 IN, OUT
USA
CLASS 2
1 IN, OUT
IEC
PELV
DO NOT USE
GRAFIK Eye
 4000 Series Control Unit Installer's Guide     9
®
Total PELV (Class 2: USA) 
wiring length is 2000 ft. 
e
(610 m).
4
3
2
4
1
3
2
1
f
4
3
4
2
1
3
2
1
4
3
2
4
1
3
2
1
A4
4.5 in. (110 mm) minimum for cover
Limited by physical size of unit.  
Must be able to open front cover.

Publicité

loading

Ce manuel est également adapté pour:

41004500