Télécharger Imprimer la page

ECOFOREST VAP 30 Manuel D'installation Et Maintenance page 35

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
Male eyebolt DIN580 M12
Broad brimmed washer DIN9021
M12
Hex nut DIN934 M12
Select appropriate slings to the weight of the boiler. (See specifications of the boiler).
Respect minimum elevation angle of the sling and verify proper load sharing between them.
If the lifting is done without having removed the hopper assembly - boiler body, the hopper must be empty.
Attention!: If the boiler is lifted in full, it will pitch. Lift carefully.
4.24. Check the space between the boiler, the fuel, and any flammable material, check drawing 8.
4.25. Do not install the boiler in a sleeping room.
4.26. The power cable provided by ECOFOREST is 1.4m long; you might need a longer one. Always use a cable with
ground plug.
FREE SPACES AND MINIMUM DISTANCES WITH FLAMMABLE MATERIAL.
x4
x4
x4
Drawing 7
LOCATION AND SAFETY DISTANCES.
34
Drawing 6

Publicité

loading

Ce manuel est également adapté pour:

Vap 38