Panasonic TY-VK55LV1 Instructions D'installation page 28

Masquer les pouces Voir aussi pour TY-VK55LV1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 55
Fitting procedure
  * The positions of the screw holes in the surface alignment magnets Ⓖ differ according
to the type of main unit to be mounted.
 * For 47-inch main units, insert the plates Ⓗ
between the surface alignment magnets Ⓖ and the
main unit, as shown on the diagram at the right.
Note
  • The surface alignment magnets Ⓖ are strong.
Keep watches, magnetic cards (credit cards),
etc., away from them.
4. Checking the strength of the place
of installation
① The installation mount weighs approxi-
mately 21 kg (46.3 lbs) [TY-VK55LV1] or
20 kg (44.1 lbs) [TY-VK47LV1]. See the
main unit's operating instructions for the
weight of the main unit to be mounted
onto the installation mount.
② Referring to the external dimensions dia-
grams (pages 94 to 95), check the forms
of the mount holes and the strength of
the place of installation, and if strength
is lacking, reinforce suffi ciently.
Note
  • Mount the necessary number of bolts
(not included) in positions allowing the
installation mount to be fastened securely.
Be sure to fasten with bolts.
5. Mounting the installation mount on the mount surface
Determine the positions of the holes to be used for mounting the installation mount to the
mount surface based on the external dimensions diagrams (pages 94 to 95), then mount
the installation mount onto the mount surface.
① Check the installation mount's upward direction of installation then mount.
② Use a level gauge, etc., to correct for any slanting as you fasten the bolts to the
mount surface.
Note
  • When mounting multiple units, first mount the unit that will serve as the base position.
(See following page.)
28
Mount the magnet fi xing screws Ⓑ in the
appropriately positioned holes.
• Small holes ........ M4 [A]
(Tightening torque: 1.2 to 1.5 N·m)
• Large holes........ M6 [B]
(Tightening torque: 1.8 to 2.2 N·m)
Note
  • Mount the surface alignment magnets Ⓖ so that
the main unit is horizontal.
Mount surface fi xing holes
Mount surface fi xing holes
Ⓗ Plates
Upwards
direction of
installation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ty-vk47lv1

Table des Matières