Aquaglide SOAKER LOUNGE Manuel Du Propriétaire page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Insert air pump hose with proper valve fitting into Main Valve [1], lock into place. Use
pump to inflate Main Valve [1] to Working Pressure as shown in Chart 1. Check for proper
pressure using gauge (manometer). Replace valve cap.
4. Repeat step 3 instructions (if necessary) to inflate each chamber to proper Working
Pressure shown in Chart 1 until all chambers are properly inflated.
5. Confirm that suitable anchor(s) and mooring lines are in place before launching this item
(see Anchoring).
6. To launch product, lift completely and place in water. Large items may require many extra
people to accomplish this. Never drag product as damage may occur.
7. When connecting multiple items together, always follow manufacturer's
recommendations. Use only Aquaglide Two-Step Vario-lock cinch straps and connecting
rings. Make sure connection is tight and there is NO GAP between items. Failure to connect
items properly may result in injury or death. See D1 through D6.
D-1
D-4
a. Attach straps to 'Connectors' (example: Swimstep, Splashmat, Speedway, Breezeway
or Deck) where a connection is required. Connectors should not be attached to other
connectors.
b. Use all available rings to make connection. Standard connections use 5 rings. Some
items use 3 or occasionally 7 rings/ straps. Soaker Lounge has 5-ring sets on 2 sides.
c. Float 'Connector' into desired position. Note: a matching set of connecting rings is
required on feature item.
d. Attach center strap to center ring on feature item. Connect loosely, then work outward
until all straps are connected.
e. Dive beneath to tighten all straps securely. Dive mask and several attempts may be
required.
7
D-2
D-5
D-3
3
1
2
D-6
0mm
www.aquaglide.com
5X

Publicité

Table des Matières
loading

Table des Matières