Maintenance; Maintenance Schedule; How To Order Repair Parts; Life Of Operator Feature (Odometer/Cycle Counter) - LiftMaster Logic 5.0 GSD Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MAINTENANCE

MAINTENANCE SCHEDULE

For use with Maintenance Alert System.
Check at the intervals listed in the following chart:
ITEM
Drive Chain
Sprockets
Clutch
Belt
Fasteners
Manual Disconnect
Bearings and Shafts
LiftMaster Monitored
Entrapment Protection (LMEP)
Use SAE 30 Oil (Never use grease or silicone spray).
• Do not lubricate motor. Motor bearings are rated for
continuous operation.
• Do not lubricate clutch or V-belt.

LIFE OF OPERATOR FEATURE (ODOMETER/CYCLE COUNTER)

The operator is equipped with an odometer to show how many
months and cycles the operator has performed from the time it as
installed. This feature can help determine how long the operator
has been in service.
1. Start with the door in the closed position.
2. Turn the selector dial to DIAG (diagnostic mode).
3. Press and release the MAS button on the logic board.

GSD BRAKE

A solenoid brake comes standard on the GSD model. The brake is adjusted at the factory and should not need additional adjustment for
the life of the brake assembly.
Inspect the brake pad and replace brake assembly when necessary.
Maintenance
PROCEDURE
Check for excessive slack.
Check and adjust as required.
Lubricate.
Check set screw tightness.
Check and adjust as required
Check condition and tension.
Check and tighten as required.
Check and operate.
Check for wear and lubricate.
Check alignment and functionality.

HOW TO ORDER REPAIR PARTS

OUR LARGE SERVICE ORGANIZATION SPANS AMERICA
Installation and service information are available.
Call our TOLL FREE number:
To avoid SERIOUS personal INJURY or DEATH:
• Disconnect electric power BEFORE performing ANY
adjustments or maintenance.
• ALL maintenance MUST be performed by a trained door
systems technician.
EVERY
EVERY 3 MONTHS
MONTH
OR 5,000 CYCLES
Repeat ALL procedures.
Inspect and service whenever a malfunction is observed or
suspected.
1-800-528-2806
LiftMaster.com
4. Press and release the MRT button on the logic board.
5. The open and close lights will flash. OPEN for every 5,000
cycles and CLOSE for every 3 months.
6. Return the selector dial to the desired wiring type.
NOTE: If the operator has not reached 5,000 cycles or 3 months,
there will be no indications.
27
EVERY 6 MONTHS
EVERY 12 MONTHS
OR 10,000 CYCLES
OR 20,000 CYCLES

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Logic 5.0 sdGsdSd

Table des Matières