Operation; Storage; Moving The Diesel Trolley; Loading - CEMO PE Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

GB
5. Perform a test filling as described in
section 5.6, but hold the delivery nozzle in
the still open filling opening.
6. Close the filling opening with the
screw cap.
Also close the ventilation cap in the
screw cap.
The filling station is now ready for operation.

5. Operation

5.1 Storage

Important!
Material damage (deformation) of
the tank from excessive heating or
mechanical overload.
• do not expose the high-grade plastic tank to
direct sunlight for extended periods either
during transport on the vehicle or when in
storage.
Suitable storage conditions:
• ambient temperature: -10°C to +40°C
(cover or take other suitable measures when
storing outdoors)
• floor: level and smooth (without pointed
projections)
5.2 Moving the diesel
Important!
i
The completely filled diesel trolley is
heavy.
This diesel trolley can be simply transported on
its wheels with air-filled tyres.
Note that considerable downhill forces arise on
steep slopes.
14
Ventilation
cap
Screw cap
Fig. 01

5.3 Loading

Important!
i
The completely filled diesel trolley
is heavy – do not try to lift it on your
own.
The empty diesel trolley can be loaded using the
grip recesses j in the area of the wheels and
the transport handle. Note that the equipment
weighs 20 kg when empty.

5.4 Transporting

During transport, observe the pertinent
regulations for transport and securing loads,
in particular:
• Road traffic (licensing) act of the country in
question,
• CEN 12195 Parts 1 to 4 for calculation and
lashing.
For fastening on the transport vehicle by means
of suitable tension belts, lay the tension belts in
the integrated recesses k on the tank.
Important!
i
Positive fit before traction! First, try
to positively load the equipment
(e.g. through striking the sides).
Excessive lashing forces can deform the tank
and thus damage it.

5.5 Filling the tank

Place the diesel trolley in a horizontal position
and remove screw cap.
Fill the container through the filling opening
using a delivery nozzle with automatic shut-off
feature.
After filling, close the filling open tightly again
with the screw cap a. Also close the ventilation
cap in the screw cap.
Contamination of the container caused by the
filling process must be removed immediately
with a dry cloth.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K10c

Table des Matières