Hose Connection To The System; Up45 F-R-T - Ultraflex UP25 F Manuel D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ULTRAFLEX

3.10 Hose connection to the system

3.10.1 Hose connection to the system for models UP 25 F-R-T, UP 28 F-R-T, UP
33 F-R-T, UP 39 F-R-T, UP 45 F-R-T
Connect the hydraulic hoses ULTRAFLEX kit OB (supplied separately) joining the pump and the cylinder
1
by following the instructions given in the installation manual of the kit OB.
2
If one or more additional steering stations are installed (except the pumps series "NV"), use the kit OB-
2S by following the suitable instructions.
Position 3/8" straight unions (1) on the pumps as indicated in the picture.
Put some fitting sealant type Loctite 542 or Loctite 545 on the thread. Fit and screw manually the fittings (1)
until they are completely inserted; then tighten them with a 7/16" open end wrench with a torque of 17.6 Nm
(156 lb ft).
WARNING
Do not use teflon tape or adhesive tape. Pay attention to the sealant positioning: if it is inserted into the
system, it could block it and make it unusable.
MAIN STEERING STATION
3
Connect pipes as shown in picture following the manual instructions.
MAIN STEERING STATION
Kit OB
cylinder
connecting
pipe
1
Kit OB-2S
Kit OB
cylinder
connecting pipe
Installation and maintenance manual
ADDITIONAL STEERING STATION
MAIN STEERING STATION
Kit OB
cylinder
connecting
pipe
PUMP FOR HYDRAULIC SYSTEMS
1
Kit OB-2S
Kit OB
cylinder
connecting
pipe
page 25
-
of 101

Publicité

Table des Matières
loading

Table des Matières