Ultraflex UP25 F Manuel D'installation Et D'entretien page 18

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ULTRAFLEX
4
By using the proper template supplied with
this manual, make the holes required by the
installation in the suitable position on the
dashboard.
5
Position the pump (2) on the dashboard rear
side (5). Then position the gasket (6) as shown in
the picture and the flange (7) with the protective
projecting part towards the dashboard outside.
Fix the pump (2) with the 3 special screws (8)
with a torque of 25 Nm (18.5 lb ft).
CAUTION
Make the shaft pass through the flange equipped
with gasket by preventing the key seat from
damaging the gasket itself.
WARNING
Install the pump by positioning the filling hole
(9) towards the top (see the picture) for the right
pump operation and to allow filling and purging
the system completely (see par. 3.11).
6 Position the plastic hub-cap (10) with the water
discharge towards the bottom and fix it with the
3 self-tapping screws (11) supplied with a 1,5Nm
(1,13 lb ft) torque.
page 18
of 101 -
PUMP FOR HYDRAULIC SYSTEMS
Installation and maintenance manual
4
5
8
7
6
8
8
11
10
9
2

Publicité

Table des Matières
loading

Table des Matières