Installation; General; Unpacking; Placement - ESAB EPP-400 Manuel D'instructions

Source d'alimentation pour plasma
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 174
sectIon 3

3.1 general

WarnIng

3.2 unpacking

cautIon
cautIon
Inspect for transit damage immediately upon receipt.
Remove all components from shipping container and check for loose parts in container.
Inspect louvers for air obstructions.

3.3 placement

A minimum of 0.61 M (2 ft.) clearance on front and back for cooling air flow.
Plan for top panel and side panels having to be removed for maintenance, cleaning and inspection.
Locate the EPP-400 relatively close to a properly fused electrical power supply.
Keep area beneath power source clear for cooling air flow.
Environment should be relatively free of dust, fumes and excessive heat. These factors will affect cool-
ing efficiency.
cautIon
faIlure to folloW InstructIons coulD leaD to Death, In-
jurY or DaMageD propertY. folloW these InstructIons to
prevent InjurY or propertY DaMage. You Must coMplY WIth
local, state anD natIonal electrIcal anD safetY coDes.
using one lifting eye will damage sheet metal and frame.
use both lifting eyes when transporting with overhead method.
unit weighs over 907 kg. (2000 lbs.) use approved straps or cables in
good condition.
Use both lifting eyes when transporting from overhead.
conductive dust and dirt inside power source may cause arc flash-
over.
equipment damage may occur. electrical shorting may occur if dust is
allowed to build-up inside power source. see maintenance section.
note:
97

InstallatIon

Publicité

Table des Matières
loading

Table des Matières