section 6
notice
6.4.3 power shunt installation
caution
There are two cables that attach to the shunt pick-up points:
a two conductor cable drives the ammeter
a three conductor which provides the current feedback signal to PCB1 (control PCB).
Dressing of the 2 conductor cable is not critical.
The following is the dressing procedure for the 3 conductor cable.
The breakout point should be physically at the middle of the shunt. The breakout point is the place
where the conductors exit from the outer insulation jacket.
The black and clear insulated wires must be kept next to the shunt and under the cable ties.
The wire terminals for the black and clear insulated wires should be oriented in parallel with bus bars
as shown.
some power sources may contain snubber resistors and capacitors
in a molded module similar in size and mounting to the free wheel-
ing diode modules. these snubber modules utilize two conductive
straps. one strap attaches to the free wheeling diode terminal #1
and the other to terminal #3. strap to #3 is sandwiched between the
free wheeling diode and the stamped copper bus. the strap to #1
is mounted on top of the copper bus under the mounting hardware
and in direct contact with the copper bus.
instability or oscillation in cutting current can be caused by im-
proper dressing of shunt pick-up leads.
poor torch consumable life will be the result.
Terminals parallel
to bus bars