Ibc / Tote Installation - Tuthill FILL-RITE DEF DF Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IBC / Tote Installation

IMPORTANT! After initial assembly and installation, flush the entire dispensing system by pumping 5 – 10
gallons of DEF through it. This purges the system of air, and insures any impurities that may have been in
the system are washed out. Dispose of the DEF used to flush the system using approved DEF handling
procedures; do not return the fluid to the drum or tote, or use it in a vehicle.
WARNING! DO NOT overtorque the threaded collars that seal the barbed fittings to the inlet and outlet ports
of the pump. The design features BSPP threads and an o-ring seal that does not require excessive torque to
provide a liquid / air tight seal.
1. Hang Pump Bracket onto IBC.
2. Install Suction Hose to suction side of pump with
included barb fittings and hose clamp (Figure 4).
Suction side is left side when facing mounted
pump.
3. Install the opposite end of suction hose to
closed loop suction device with appropriate
fittings (Models DF120CAT520, DF012CAT520,
DF120CAN520-RP, and DF012CAN520-RP
include an RPV to attach) (Figure 4)
4. Install Discharge Hose with nozzle to discharge
side of pump with included barb fittings and hose
clamp (Figure 4).
5. Tighten each hose clamp to secure suction and
discharge hoses to all barb fittings to prevent fluid
leaks (Figure 5a - 5c).
Figure 5a
Figure 5b
Figure 5c
Inlet
(Suction)
Outlet
6. Hook Nozzle Bracket to IBC Cage at preferred location.
Secure to cage with included tie strap (Figure 6a).
7. Insert Nozzle Reservoir into Nozzle Bracket and snap into
opening. Add water to reservoir to prevent urea
crystallization in nozzle (Figure 6a).
8. Wrap Discharge Hose around the Pump Bracket behind
Fill-Rite Ledge. Final installation should look like the image
below (Figure 6b):
Figure 6a
5
RPV
Figure 4
Figure 6b
OR

Publicité

Table des Matières
loading