Mounting The Range Hood - Zephyr Okeanito COK-E36CSX Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ZEPHYRONLINE.COM

Mounting the Range Hood

C/L
B
9-11/16"
A
C/L
FIG. B
1. Measure from cooking surface to desired hood bottom, level and mark line A. (26" minimum from
cooking surface)
2. Plum and mark center line.
3. Mark line B, 9-11/16" up from line A. This is the top position of the wall bracket. FIG. B.
4. Follow center line up to the ceiling, measure and mark ceiling bracket mount line C, 6" out from
the wall onto the ceiling. FIG. C.
5. Mark ceiling bracket mounting spread, 8-11/16" from center line on line C. FIG. C.
6. Place duct cover ceiling bracket onto ceiling and mark inside diameter of ceiling bracket. Cut
inside diameter of ceiling bracket to fit the 6" or 8" round duct pipe.
7. Prepare duct work and electrical through ceiling.
8. Attach ceiling bracket to ceiling by (2) M4 * 38 screws. Wood blocking may need to be added
inside ceiling to support the weight of the upper duct cover.
9. Place and center the top of wall bracket on line B, FIG. B. The top of the wall bracket will have a
gap between the bracket and the wall. FIG. D.
Okeanito Use, Care, and Installation Guide
6 "
C
L
C /
14-1/2"
min. 26"
max. 36"
Installation Instructions
FIG. C
i n .
a x .
" m
2 8
" m
3 6
Top
gap between
bracket and
wall
Bottom
FIG. D
15

Publicité

Chapitres

Table des Matières
loading

Table des Matières