Mounting The Hood - Zephyr Titan Island AK7736BS Guide D'utilisation, D'entretien Et D'installation

Masquer les pouces Voir aussi pour Titan Island AK7736BS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Mounting the Hood

CAUTION
At least two installers are required due to the weight
and size of the hood.
1. Determine mounting location on ceiling and
temporarily tape paper template (included with
the hood) to the ceiling. Cut out internal shaded
area of template to allow the ducting and electrical
to pass through. If necessary, add wood blocking
(min. 2" x 4") to ceiling joists located behind the
drywall to reinforce the mounting location*. (FIG.
B1). Secure (2) M6 x 2" wood screws to points A and
B of the paper template (FIG. C). Do not completely
tighten screws, leave approximately 1/4" exposed.
2. Remove screws securing top and bottom support
frames together. Adjust support frame to
accommodate the desired hood height and re-
assemble the frame using the previously removed
screws (2 screws for each support frame arm). (FIG.
B3).
*Hood is intended to be mounted to a finished ceiling.
B
Cut-Out Shaded Area
14
FRONT
A
FIG. C
Ceiling Joists
Wood Blocking
Top Support Frame
Support Frame Arm
Bottom Support Frame
Hood Body
XP022220
Titan Island Use, Care, and Installation Guide
T I TA N I S L A N D
Mounting Screws
(pre-installed)
FIG. B
Top Support Frame
FIG. D
P R O
WA L L
1
2
3
4

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Titan island ak7742bsTitan island ak7748bs

Table des Matières