Mounting The Hood - Zephyr Siena Pro Island ZSL-E42CS Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Mounting the Hood

CAUTION
At least two installers are required due to the weight
and size of the hood.
1. Determine mounting location on ceiling and
temporarily tape paper template (included with
the hood) to the ceiling. Cut out internal shaded
area of template to allow the ducting and electrical
to pass through. If necessary, add wood blocking
(min. 2" x 4") to ceiling joists located behind the
drywall to reinforce the mounting location*. (FIG.
B1). Secure (2) M6 x 1" wood screws to points A and
B of the paper template (FIG. C). Do not completely
tighten screws, leave approximately 1/4" exposed.
2. Remove screws securing top and bottom support
frames together. Adjust support frame to
accommodate the desired hood height and re-
assemble the frame using the previously removed
screws (2 screws for each support frame arm). (FIG.
B3).
*Hood is intended to be mounted to a finished ceiling.
B
Cut-Out Shaded Area
14
FRONT
A
FIG. C
Siena Pro Island Use, Care, and Installation Guide
Ceiling Joists
Wood Blocking
Top Support Frame
Support Frame Arm
Junction Box
Bottom Support Frame
Hood Body
XP022220
S I E N A P R O I S L A N D
Mounting Screws
(pre-installed)
FIG. B
Top Support Frame
FIG. D
C O R E
I S L A N D
1
2
3
4

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Siena pro island zsl-e48cs

Table des Matières