Mounting The Hood - Zephyr Siena Pro ZSP-E36CS Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Mounting the Hood

1. Measure from range top to hood bottom and
mark line A. (24" minimum from range top).
2. Plum and mark center line.
Mark mounting height line B. (12-1/8" from line A)
Mark mounting spread from C/L on line B. (14-
15/16")
3. Fasten (2) M4 x 38 screws into studs on line
B. Do not fasten screws all the way, leave
approximately 3/8" exposed.
NOTE: Wood blocking may need to be added
behind the drywall if no studs are present. Wall
anchors may also be used but check local codes
for compliance. Failure to use suitable wall
anchors and screws to hold the weight of the
hood could result in personal injury or damage to
cooking surface or counter.
4. Install 10" round duct collar with backdraft
damper to top of body of hood by (4) M4 x 8 flat
screws.
5. Hang hood onto screws and hand tighten. (FIG.
B1) Use the last M4 x 38 screws to further secure
the hood to the wall from inside the hood. (FIG
B2).
6. Center and attach duct cover bracket to wall
below ceiling or soffit using (2) M4 x 38 screws.
7. Position electrical outlet within the space covered
by the telescopic duct covers and where it will not
interfere with the round duct. (FIG. C)
8. Install duct work and duct tape. Power up hood
and check for leaks around duct tape.
9. Place telescopic duct covers onto hood and
extend inner (top) duct cover upwards and secure
to duct cover bracket using (2) M4x8 screws.
14
B
1-3/8"
C
2
H O O D
C E N T E
R L IN E
Siena Pro Use, Care, and Installation Guide
S I E N A P R O
C/L
Duct Cover Bracket
14-15/16"
12-1/8"
A
13"
24" min
C/L
1
FIG. B
5 -
1 /2
" - 8 "
2 4 "
M A X .
1 1 -
5 /1 6
FIG. C
C O R E
WA L L
"

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Siena pro zsp-e42csSiena pro zsp-e48cs

Table des Matières