Zephyr Titan Island AK7736BS Guide D'utilisation, D'entretien Et D'installation page 18

Masquer les pouces Voir aussi pour Titan Island AK7736BS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
PBD-1300B Dual Blower Installation
18
5. Position dual blower inside hood
body as shown. Be sure to tuck
dual blower plate into blower
plate tabs. Secure dual blower
by (4) screws previously removed
from step 2.
6. Attach 10" round blower collar
to top of hood body by (4) M4x8
screws.
7. Attach dual blower PCB to
electronics bracket by (4) screws.
Refer to wiring diagram on this
step. Connect the wiring from
the dual blower including both
blower plugs, blower cable 6 pin
connector (E), dual blower switch
cable (H), black single pin power
cord from dual blower (K), and
white single pin power cord (F) to
dual blower PCB.
Titan Island Use, Care, and Installation Guide
P R O
T I TA N I S L A N D
WA L L

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Titan island ak7742bsTitan island ak7748bs

Table des Matières