Maintenance; Uninstalling Theblw Vacuum/Pressure Blowers Pump; Types Of Maintenance And Related Frequency - battioni Pagani BLW Serie Notice D'emploi Et D'entretien

Masquer les pouces Voir aussi pour BLW Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

instruction manual
for use and maintenance of BLW series
During all maintenance operations it is advisable
to use the personal protection equipment listed to
the side.
All maintenance operations, inspections, checks and repairs should be carried out with the greatest care and with
the power take-off disconnected.
Before proceeding with maintenance operations, it is advisable to wait for the BLW pump to cool down and
to return to a temperature of below 40°C.
Before performing maintenance, remove the differential pressure from the system and restore it to
atmospheric pressure.

6.1 - UNINSTALLING THEBLW VACUUM/PRESSURE BLOWERS PUMP

The BLW vacuum/pressure blowers pump must be uninstalled using the following procedure:
BLW / H
1) Stop the hydraulic system.
2) Remove the hydraulic connections to the engine.
3) Remove the connection pipe that joins the tank to the BLW pump,
unscrewing the metal clamp and removing the pipe from the sleeve.
4) Remove any hydraulic or pneumatic connections.
5) Remove the fixing screws and de-install the BLW vacuum/pressure
blowers pump

6.2 - TYPES OF MAINTENANCE AND RELATED FREQUENCY

The following table shows the maintenance required to keep the machine in perfect working order.
TYPE OF MAINTENANCE
Oil level inspection
Manifold cone greasing
Filter cleaning
Oil top-up
Oil replacement
Seal replacement
Checking of operation of the manifold check valve and Ballast
Replacement of the manifold check valve and Ballast
page 40

6.0 - MAINTENANCE

1) Stop the pulley drive.
2) Remove the transmission belts.
3) Remove the connection pipe that joins the tank to the BLW pump,
unscrewing the metal clamp and removing the pipe from the sleeve.
4) Remove any hydraulic or pneumatic connections.
5) Remove the fixing screws and de-install the BLW vacuum/pressure
blowers pump
upon each use
every week
where required
where required
1000 work hours or 12 months
when necessary or each time the parts that contain the seals open
12 months
3 years
BLW / P- PM
FREQUENCY

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Blw 140 hBlw 210 hBlw 270 hBlw 300 hBlw 400 h

Table des Matières