Backguard Installation - Thermador PROFESSIONAL PRO HARMONY Serie Instructions D'installation

Masquer les pouces Voir aussi pour PROFESSIONAL PRO HARMONY Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Backguard Installation

WARNING
Fingers or hands could get pinched when installing the
backguard. Severe injury could result. Use extreme
caution and wear thick protective gloves to avoid
potential laceration to finger or hand while sliding the
backguard down onto the range.
When installing against a combustible surface, a Low
Backguard is required. A THERMADOR
must be purchased separately. See "Installation
Clearances with Lowback" beginning on page 7.
When using the Flush Island Trim, THERMADOR
recommends a minimum 12'' (305 mm) rear clearance to a
combustible surface (see "Installation Clearances").
Clearances from non-combustible materials are not part of
the ANSI Z21.1 scope and are not certified by
CSA. Clearances of less than 12'' (305 mm) must be
approved by the local codes and/or by the local authority
having jurisdiction.
NOTE: If a Backsplash is to be used in addition to a
backguard, install the Backsplash first and the backguard
second before sliding range into place.
LOW BACK PARTS INCLUDED
1 – Low Back panel
8 or 9 – T-20 Torx stainless screws
8 or 6 – T-20 Torx drill point screws
TOOLS NEEDED
T-20 Torx head screwdriver or drill
Protective Work Gloves
Installation Instructions
Backguard Installation
1. Depending on model, remove the (3) or (4) T-20 Torx
TM
Low Backguard
2. Remove the (4) drill point screws securing the trim to
stainless screws in the front face of the included Flush
Island Trim.
Figure 15: Flush Island Trim Front Face Screw Removal
the side panels, and the (2) to (4) drill point screws
securing the piece to the back panel. Lift up to fully
remove.
Figure 16: Flush Island Trim Rear Screw Removal
English 19

Publicité

Table des Matières
loading

Table des Matières