Télécharger Imprimer la page

RDI Transform 73019237 Instructions Pour L'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

4.
Place gate on a flat, stable surface to mount
the hinges to the gate. The gate can be
adjusted to swing up to 160°. If you want the
gate to swing inward, mount the hinges to
the inside of the gate. To have the gate swing
outward, mount the hinges to the outside of
the gate.
Place the hinges at the desired position on
the gate upright; if mounting gate to the left
side post, the head of the tension adjustment
pin and the + or – sticker should be facing
up. If mounting to the right side post, the
head of the tension adjustment pin and the
+ or – sticker should be facing downward.
Hinges have self-closing feature, which can
be disabled if desired (see hinge tension
adjustment).
Place hinges at desired positions on gate
upright/rail with a minimum spacing of 32"
between each hinge. Mark lines on gate
upright/rail at top and bottom of both gate
plates (Fig. 4).
4
5.
Using the included allen wrench, remove the
two set screws that secure the swing arm to
the gate plate (Fig. 5).
Place the gate plates firmly against gate
upright/rail between the lines you marked from
Step 4, Figure 4. Drill two pilot holes through
the screw holes in the front of each gate plate
3
with a
/
" bit (Fig 6).
32
NOTE: Pilot holes should NOT be drilled all the
way through gate uprights/rails.
Secure gate plates to gate upright/rail using
two 1 ¼" flat head screws.
Set gate on edge and drill two
through the screw holes in the side of the gate
plate. Secure with two 1¼" flat head screws
per plate.
Place the swing arms back into the gate
plates and use included allen wrench to
secure the two set screws that hold the swing
arm to the gate plate
(Fig. 4)
6.
Position gate at desired height on post.
Horizontal rails on gate should be even with
horizontal rails on railing (Fig. 7).
Measure space between ground and bottom
of gate and cut two wood spacer blocks to
this height. Rest gate on the spacer blocks
and hold it level/plumb to the gate post.
Swing arm must rest firmly against gate post.
While holding swing arms firmly against post,
mark pilot holes on the post, through the two
screw slots in the front of the swing arms (Fig.
8). Remove gate and drill
post. Re-position gate on post and secure
3
/
" pilot holes
hinges with two 1¼" pan head screws per
32
hinge.
(Fig. 5)
(Fig. 6)
Gate Upright
Railing Post
3
/
" pilot holes in
32
(Fig. 7)
(Fig. 8)

Publicité

loading