Important Safety Instructions - Bosch HDIP054 Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9 IMPORTANT SAFETY INSTRUCTIONS

READ AND SAVE THESE INSTRUCTIONS
Safety
9 WARNING
If the information in this manual is not followed
exactly, fire or shock may result causing property
damage or personal injury.
Important Safety Instructions
Please read Installation Instructions before beginning
the conversion
Please read all instructions before proceeding. Save
the natural gas parts for possible conversion from LP
back to natural gas in the future
This kit is used to convert dual fuel ranges and gas
ranges from natural gas operation to propane (LP) gas
operation. This conversion kit is only for use with BSH
Home Appliances manufactured ranges.
CAUTION: When connecting the unit to the propane
gas,make certain the propane gas tank is equipped
with its own high pressure regulator. In addition, the
range has its own pressure regulator. Verfiy that it is
installed for the appropriate gas supply.
The maximum gas pressure to this appliance is not to
exceed 14.0 inches water column from the propane
gas tank regulator.
The following must be met when testing supply piping
system:
a) The appliance and its individual shut-off valve must
be disconnected from the gas supply piping system
at test pressures in excess of 1/2 psig (3.5 kPa).
b) The appliance must be isolated from the gas sup-
ply piping system by closing its individual manual
shut-off valve during any pressure testing of the
gas supply piping system at test pressures equal to
or less than 1/2 psig (3.5 kPa).
WARNING: This conversion kit shall be installed by a
qualified service agency in accordance with the
manufacturer's instructions and all applicable codes
and requirements of the authority having jurisdiction. If
the information in these instructions is not followed
exactly, a fire, explosion or production of carbon
monoxide may result causing property damage,
personal injury or loss of life. The qualified service
agency is responsible for the proper installation of this
kit. The installation is not proper and complete until the
operation of the converted appliance is checked as
specified in the manufacturer's instructions supplied
with the kit.
For Massachusetts Installations:
1) Installation must be performed by a qualified or
licensed contractor, plumber or gas fitter qualified
or licensed by the state, province or region where
this appliance is being installed.
2) Shut-off valve must be a "T" handle gas cock.
3) Flexible gas connector must not be longer than 36
inches.
High Altitude Installation Note: For high altitude
installations, please refer to customer service.
English 2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hgi8054 sérieHgip054 sérieHdi8054 série

Table des Matières