Check Operation - Electrolux EI30GS55JS Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

30" GAS SLIDE-IN RANGE INSTALLATION INSTRUCTIONS
10

Check Operation

Refer to the Use and Care Guide packaged with the
range for operating instructions and for care and
cleaning of your range.
Do not touch the elements or burners. They may be hot
enough to cause burns.
Remove all packaging from the oven before testing.
10.1
Install Burner Caps and Triple burner head
This cooktop is equipped with sealed burners.
A. Unpack the burner grates.
B. Regular Burners: Burner heads and burner caps are
already on the surface. Remove all tapes from burner
caps and verify if they are correctly place on the
burner heads (see Figure 9).
Burner Cap
Gas Opening
Electrode
Figure 9
Burner Cap
Burner Head
Figure 10
(Models with Sealed Top Burners)
C. Triple Burner (if equipped): Remove all tapes
D. Be sure that all the burner caps and the triple burner
NOTE: There are no burner adjustments necessary on
this cooktop.
Shutoff Gas Valve
Operation of electric igniters should be checked after
range and supply line connectors have been carefully
checked for leaks and range has been connected to
electric power. To check for proper lighting:
1. Push in and turn a surface burner knob to the LITE
2. The surface burner should light when gas is available
Burner Head
3. Once the burner lights, the control knob should be
There are separate ignition devices for each burner. Try
each knob separately until all burner valves have been
checked.
9
from burner cap. Remove the burner cap and head.
Remove and discard the packaging material. Replace
head and cap on the triple burner. Be careful not
to damage the electrode while placing the head
over the orifice. Make sure electrode fits correctly
into slot in burner head (see Figure 10).
head are correctly placed BEFORE using your cooktop.
10.2
Turn on Electrical Power and Open Main
10.3
Check the Igniters
position. You will hear the igniter sparking.
to the top burner. Each burner should light within
four (4) seconds in normal operation after air has been
purged from supply lines. Visually check that burner
has lit.
rotated out of the LITE position.

Publicité

Table des Matières
loading

Table des Matières