GE Appliances Zoneline 4100 Manuel D'utilisation Et Instructions D'installation page 15

Table des Matières

Publicité

MAKE ELECTRICAL CONNECTION TO THE UNIT
REMOVE JUNCTION BOX
1
1. Remove the junction box cover by removing the front
two screws.
2. Remove the junction box by removing the top and
bottom rear screws. Note how the tabs on the lower
left side of the junction box serve to hold the side in
place. This will help when the box is being reinstalled.
CONNECT THE CORDSET
2
Plug the connector, provided in the Direct Connect Kit,
fully into place in the unit mating connector. Be sure
the locking tabs at the sides are engaged.
Connector
NOTE: Order Kit RAK4002CW to enable a quick
disconnect inside the junction box.
Installation Instructions
Unit connector
Junction
Junction
box
box cover
ATTACH CONDUIT
3
1. Use the round knockout at the bottom of the junction box
to attach conduit coming from the branch circuit.
Remove the knockout, attach the conduit and bring wires
into the junction box. Leave 6" of wire free at the end of
the conduit to allow connections to be made.
2. If a fuse and fuseholder are to be used, the
knockout at the top of the box is for mounting
a Buss fuseholder. Be sure the fuse and fuseholder
are of the same rating as the branch circuit.
Leadwires at the fuse can be either soldered in place
or attached using UL-listed 1/4" female (receptacle)
crimp connectors. Follow local codes.
REINSTALL JUNCTION BOX
4
• Reinstall the junction box by engaging the left tabs
on the lower right face of the unit, aligning the screw
holes at the top and bottom and driving the two
screws until secure. Be sure that all wire leads are
inside the box and not pinched between the box and
the unit. The green insulated ground wire from the unit
MUST be connected to the branch circuit ground wire.
Make all wire connections by using appropriate
UL-listed electrical connectors and techniques
(black to black, white to white and green to green).
REINSTALL JUNCTION BOX COVER
5
1. Carefully tuck all wires and connections back inside
the junction box. Be sure there are no loose
connections or stray uninsulated wires exposed.
2. Place the junction box cover in place. Replace the two
screws removed earlier and tighten securely.
15
Conduit

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Appliances zoneline 6100

Table des Matières