Installation
iii Installation procedures
Wheel balancer:
Refer to the drawing for correct wheel balancer
positioning. If the wheel balancer needs securing,
we recommend fixing elements with a diameter of
8 mm, quality 8.8 or higher.
Supports for Accessories:
• Unpack the 4 threaded accessory support studs
and the support plates.
• Refer to Figure iii-1. Fit the 4 threaded accessory
support studs and the plates.
Clamping devices:
• Put the clamping devices on the accessory studs.
Fitting and connecting the monitor
Fig. iii-2 VESA support
The 4 screws needed (M4x8) to fix the VESA support
to the monitor are part of the kit supplied.
 Fix the VESA support to the monitor.
Figure iii-3 Connection of monitor and PC
Caution
Before connecting the electronic cables turn off the
mains switch.
 Plug in the plug (1, Fig.iii-3) of the power supply
cable.
 Insert the monitor connector into the right socket
(2) of the embedded unit.
 Insert the connector USB (3) into the PC and the
monitor.
 Insert the monitor main connector (4) into the
socket.
 Insert the audio Jack (5) in the monitor socket.
Note:
The warning beeps from the machine
cannot be heard if the audio cable is not
connected.
iv Test procedures
• Balance a wheel to less than 0.25 oz. (5 grams) per
plane.
• Perform a User Calibration.
v Instructing the operator
(Following applies only if a unit is installed by a service
Technician)
• Show and explain the Safety Booklet.
• Show the operator how to switch the unit on and off.
• Show the operator how to perform an emergency stop.
• Show the operator how to select a wheel type, enter
data and apply a weight.