Télécharger Imprimer la page

GEBUWIN WW250-/D/Ex Série Mode D'emploi page 11

Publicité

Les langues disponibles

Les langues disponibles

2.2. Load
Pay attention to the following with respect to the load:
-
never leave the load unattended whilst elevated
do not allow the load to sway
-
never allow the load to fall abruptly from the cable
-
ensure that the hoisting height remains in clear view
-
2.3. Cable and hoisting material(s)
Pay attention to the following with respect to the cable and hoisting material(s):
-
only use DIN 15020 certified cables with the minimum required breaking force from chart 1.
cables and load hook must be regularly checked and maintained according to DIN 15020
-
-
the sideways leverage angle, the lanyard, must not exceed 3 degrees
-
there must be a minimum 3 safety windings on the first layer of the drum when loaded
the top of the last cable layer must have 11/2 x the cable diameter clearance between the outer edge of
-
the drum flange
the cable must be prestressed when being wrapped around the drum
-
-
never reach into the cable assembly
only grasp hold of the cable when wearing safety gloves
-
-
adhere to the correct cable capacity
loading hooks must be fitted with safety catches
-
-
according to the regulations loading hooks must be mounted to the cable with a thimble and a talurit
clamp
-
the load must be mounted correctly
3. Technical details
The type designation is as follows:
WW = range of GEBUWIN worm geared winches for hoisting load 250, 500, 1000 or 1500 kg
GR= painted grey colour
EV= zinc-plated
D= 1 cable compartment
2D= 2 cable compartments
GD= grooved cable drum
Ex= ATEX certified
safety catch
lanyard
min.3 safety windings
10

Publicité

loading