Wiring; Power And Ground; Voltage Selection - LiftMaster Elite Série Manuel D'installation

Masquer les pouces Voir aussi pour Elite Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WIRING

To reduce the risk of SEVERE INJURY or DEATH:
• ANY maintenance to the operator or in the area near the
operator MUST NOT be performed until disconnecting the
electrical power and locking-out the power. Upon completion of
maintenance the area MUST be cleared and secured, at that
time the unit may be returned to service.
• Disconnect power at the fuse box BEFORE proceeding. Operator
MUST be properly grounded and connected in accordance with
national and local electrical codes. The operator should be on a
separate fused line of adequate capacity.

POWER AND GROUND

Power and control wiring must be run in separate conduit to
comply with national and local electrical codes. For power wiring,
use the appropriate wire gauge. Use conduit knockouts, conduit
fi ttings, and appropriate conduit fi ttings for wiring as indicated
on the electrical box label.
1
Remove the operator cover.
2
Run power wires to electrical box according to national and
local electrical codes.
ON THREE PHASE MACHINES ONLY: Incorrect phasing of
the power supply will cause the motor to rotate in the wrong
direction. To change motor rotation, exchange incoming
power leads L1 and L2.
3
Attach power and ground wires to appropriate terminals.
NOTE: The operator must be properly grounded. Failure to
properly ground the operator could result in electric shock
and serious injury.
POWER WIRING CHART
DISTANCE
50 feet (15.2 m)
100 feet (30.5 m)
200 feet (61 m)
350 feet (106.7 m)
500 feet (152.4 m)
1000 feet (304.8 m)
* Maximum wire gauge that can be connected to the operator's
terminal is 12 AWG. When a larger wire gauge is required, the wire
must be gauged down to 12 AWG. USE COPPER WIRE ONLY.

VOLTAGE SELECTION

For all operators except for 575V 3 Phase operators, follow the
steps below. The motor harness is connected to the power board
at the factory on all 575V 3 Phase operators.
1
Locate motor harness inside of the electrical box.
2
On the POWER BOARD fi nd the appropriate receptacle
matching the incoming line voltage. Remove the voltage
label and apply to the inside of the electrical box for future
reference. Insert the motor harness fully until locked in place.
Wiring
WARNING
WARNING
• ALL electrical connections MUST be made by a qualified
individual.
• DO NOT install ANY wiring or attempt to run the operator
without consulting the wiring diagram.
• ALL power wiring should be on a dedicated circuit and well
protected. The location of the power disconnect should be
visible and clearly labeled.
• ALL power and control wiring MUST be run in separately.
3
GAUGE
14 AWG
12 AWG
8 AWG*
6 AWG*
Line Power
4 AWG*
208/230/460/575 Vac
2 AWG*
Three Phase
Motor
Harness
18
1
Single Phase Power Wiring
Hot
Neutral
Line Power
115/230 Vac
Ground
Single Phase
Ground
Three Phase Power Wiring
Phase 1
Phase 2
Phase 3
Ground
SINGLE PHASE POWER BOARD
2
3 PHASE POWER BOARD

Publicité

Chapitres

Table des Matières
loading

Table des Matières