Télécharger Imprimer la page
Masquer les pouces Voir aussi pour Elite Serie:

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

QuickStar t
for single gate application
2016 UL 325 Gate Operators require use of LiftMaster
external monitored entrapment protection devices.
This QuickStart is intended to highlight a single gate
application. Each application is unique and it is the
responsibility of the purchaser, installer and end user to ensure
that the total gate system is installed and operated properly.
Refer to the installation manual for complete information
regarding installation, testing, and programming.
845 Larch Avenue
Elmhurst, Illinois 60126-1196
LiftMaster.com
01-38284
© 2016, LiftMaster – All Rights Reserved
Determine location for concrete pad.
1
1" - 2" (2.5 - 5.1 cm)
1/2"
(1.8 cm)
(conduit
location)
24" (61 cm)
24" (61 cm)
INSTALLATION
Attach the front gate
Attach the rear gate
4
bracket.
bracket.
5
Attach the operator to
3
the concrete pad.
6" (15.2 cm)
Above Ground
Below the frost line. Check
all national and local codes.
Minimum of 24" (61 cm)
recommended in regions
with no frost line.
2
Install conduit and pour concrete pad.
24" (61 cm)
Attach the chain to the rear gate
bracket.
6
7
Route the chain through the operator.
Attach the chain to the front gate
bracket.
8
Remove the vent plug from the
gearbox.
9

Publicité

loading

Sommaire des Matières pour LiftMaster Elite Serie

  • Page 1 (conduit location) Route the chain through the operator. 24" (61 cm) Attach the chain to the front gate 2016 UL 325 Gate Operators require use of LiftMaster bracket. external monitored entrapment protection devices. Attach the operator to the concrete pad.
  • Page 2 OPEN 1. Open and close the gate with the test buttons, ensuring that the 1. Turn off the AC power from the main system and REQUIRES the addition of a LiftMaster external RIGHT LEFT gate is stopping at the proper open and close limit positions.
  • Page 3 à l’essai et la programmation. régions sans ligne de gel. Installer le conduit et couler le béton pour la dalle. 61 cm (24 po) 845 Larch Avenue 61 cm (24 po) Elmhurst, Illinois 60126-1196 LiftMaster.com 01-38284 © 2016, LiftMaster – Tous droits réservés...
  • Page 4 RIGHT que la barrière s’arrête aux bonnes positions limites d’ouverture et de D’OUVERTURE LEFT protection de LiftMaster contre le piégeage (capteur disjoncteur de l’alimentation principale. fermeture. 1. Pour régler la direction initiale photoélectrique sans contact ou capteur de chant avec contact) HANDING 2.
  • Page 5 Instalación de conducto y base de concreto. 845 Larch Avenue 61 cm (24 pulg.) 61 cm (24 pulg.) Elmhurst, Illinois 60126-1196 LiftMaster.com 01-38284 © 2016, LiftMaster – Reservados todos los derechos de ley...
  • Page 6 1. Para determinar la dirección interruptor principal del circuito. monitoreada de LiftMaster para CADA zona de atrapamiento del operador, los LED de 2. Colocar un objeto sólido entre la trayectoria de apertura y una (sensor fotoeléctrico sin contacto o un sensor de borde) antes de...

Ce manuel est également adapté pour:

Elite sl3000u