Wiring The Hood With An Integral Blower - Thermador Professional Série Manuel D'installation

Masquer les pouces Voir aussi pour Professional Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wiring the Hood with an
Integral Blower
From Control Panel
Figure 19: Wiring the Hood with an Integral Blower
English 12
Figure 18: Integral Blower
From Blower
1. Integral Blower models VTN630C and VTN1030C are
designed to work with the PH hoods and are sold
separately.
2. Remove the junction box cover.
3. Connect the blower's Molex plug connector to the
connector present inside the hood as shown in
Figure 19.
4. Install 1/2" (13mm) conduit connector in junction box.
5. Run black, white, and green wires (#12 AWG) in 1/2"
(13mm) conduit from power supply to junction box.
6. Connect the power supply wires to the hood wires in
the following order: black to black, white to white, and
green wire to green ground screw on chassis. Use
spring type wire nuts supplied. (Lost or missing wire
nuts should only be replaced with: Spring type wire
nuts rated for a minimum of (2) # 18ga wires and
maximum of (4) #14ga wires, UL & CSA rated to 600V
and 302° F/ 150° C.)
7. Close junction box cover. Check to see that light bulbs
are secure in their sockets. Install filters ("Installing
Filters, Grease Trays, and Heat Lamps" on page 15).
Turn power on at service panel. Check operation of the
hood.

Publicité

Table des Matières
loading

Table des Matières