Installation - Arjohuntleigh Enterprise 9600X Notice D'utilisation

Masquer les pouces Voir aussi pour Enterprise 9600X:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Installation

The following chapter describes how to install the bed.
WARNING
If the power supply cord or plug is damaged, the complete
assembly must be replaced by authorised service personnel. Do
not remove the fitted plug, or use a rewireable plug or adapter.
Make sure the power supply cord is not stretched, kinked or
crushed.
Do not allow the power supply cord to trail on the floor where it may
cause a trip hazard.
Make sure the power supply cord does not become entangled with
moving parts of the bed or trapped between the bed frame and head
board.
Disconnect the power supply cord from the electricity supply, and
store it as shown, before moving the bed.
Before the first use, or if the bed has been unused for more than
three months, read and understand this IFU and test the
functionality of the bed to verify correct operation. Refer to
"Preventive maintenance" on page 51 for a list of functional tests.
Caution
Before the first use, or if the bed has been unused for more than
three months, connect the bed to the electricity supply for at least
24 hours to allow the backup battery to recharge fully; failure to do
this may reduce the life of the battery. After charging, check that the
battery is fully serviceable by carrying out a battery test as shown
on page 53.
6

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Enterprise 9700xEnterprise 9800x

Table des Matières