Boiler Installation - Elco R600 Notice D'installation Et D'emploi

Table des Matières
Les langues disponibles
  • FR

Les langues disponibles

Installation

Boiler installation

10
1
Boiler installation
The boiler should be positioned in a
frost-proof boiler room. If the boiler
room is on the roof, the boiler itself may
never be the highest point of the instal-
lation.
When positioning the boiler, please
note the recommended minimum clea-
rance in the picture. When the boiler is
positioned with less free space, mainte-
nance activities will be more difficult.
Once the boiler is in the correct positi-
on, the wooden blocks (1) should be
removed and the adjustable feet (2)
(with vibration absorption dampers)
should be adjusted to the right height.
Water and gas connections should be
done after mounting the feet, as they
affect the exact height of all connecti-
ons.
2
2

Hide quick links:

Table des Matières
loading

Table des Matières