Important Notes; Technical Specifications; Scope Of Delivery - Franke AQUA-PROTRONIC AQRE430 Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
3.

Important notes

• Installation, commissioning and maintenance are to be performed only by a
qualified technician according to the instructions provided.
• Legal requirements and the technical connection regulations of the local water
supply companies must be complied with.
• Before assembling and installing the equipment, flush the supply pipes in accor-
dance with DIN 1988.
• Only use a 6 V lithium battery for the power supply.
• Forced flushing after 24 hours of non-use ensures the exchange of water in tap
lines and prevents the odour seal in the urinal drying out. This function can be
switched off with the optional remote activation unit. This function is switched on
at the factory.
• Use suitable cleaning agents that are not harmful to the fittings in a proper manner
and rinse with water after use. High-pressure cleaners must not be used for
cleaning.
• All rights reserved to make technical alterations.
4.

Technical specifications

Nominal diameter:
Flow pressure:
Calculation flow rate:
Flushing flow:
Flush water volume:
Flush duration:
Operating voltage:
Type of protection:
5.

Scope of delivery

Quantity
1
1
1
1
1
4
DN 15
1.0 – 4.0 bar
0.30 l/s
0.30 - 0.70 l/s
2 – 4 l adjustable
0.6 – 6.5 s (adjustable in 6 steps)
6 V lithium battery CR P2
IP 65
Description
Urinal flusher
incl. 6 V lithium battery and blockable flow
volume regulator
Flushing pipe
Urinal connector
Rosette
Installation and operating instructions

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7612982001185

Table des Matières