IMPORTANT! Any installation operation shall be carried out by a suitably
trained staff, following carefully the information given in this manual.
Check the packaging at the reception of the goods and store only at a dry place. Verify that the
device has not been damaged during transport or storage operations. Make sure you receive all
the components. Ask the manufacturer for any possible missing component.
The hose reel has to be wall mounted at a minimum height of the floor of 2.50 m in order to
prevent accidents during work operations. Considering the hose reel weight and dimensions,
its movement requires the use of lifter devices.In particular cases it is possible to mount it on the
floor or on other machines as accessory, only if complete with a fixed support. The hose-guide
arms can be fixed in three different positions according to the hose reel installation (see pictures
A-B-C p.37). IMPORTANT! Models
positions A - B.
Mount the hose reel in fixed position or with revolving stand (optional) on stiff and consistent walls
using 4 dowels of 10 mm diameter. (See drawing p.37)
WARNING! The manufacturer declines any responsibility for injuries to people or damages
to things caused by a wrong assembly of the hose reel.
Always connect the hose reel to the line by the couplers and the flexible hose (A) su-
itable for this use, above all in case of high pressure and temperature.
To avoid consequent loss of fluid tighten the fittings using appropriate keys, keep back
the swivel joints to avoid damaging them.
According to the rules, put a ball-tap on the feeding line of the hose reels in order to make
the maintenance operations easier. The said ball-tap can be used as a safety valve for dan-
gerous situations.
The connection hose is supplied as standard for models with swivel joint in composite materials.
9.1
9.2

8 - INSTALLATION

VGL600115ST - VGL600110

9 - LINK

9.1) Air/Water/Oil: Tighten the swivel joint on the shaft, fit the inlet
hose and the lateral cover.
9.2) Diesel fuel/Water 90°C (3/4"-1"): Tighten the swivel joint on
the shaft, fit the lateral cover and tighten the elbow on the
swivel joint using a suitable sealant.
9.3) Urea/Water 50°C (3/4"-1"): Mount the lateral cover and hand-
tighten the swivel joint, insert the hose into the hose connector
and fix it with the clamp.
IMPORTANT: Do not use sealants.
9.4) Oil (3/4"-1"): Tighten the swivel joint on the hub, fit the lateral
cover and tighten the elbow 90° on the swivel joint.