Télécharger Imprimer la page

General Information; Setting Up Room For Shower Tray And Shower Enclosure; Equipment - HOESCH SenseSation Instructions De Montage Et D'utilisation

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
01

General information

Hoesch products set the benchmark for quality, comfort and design.
To assure optimal function and a long life cycle of your product
please comply with the following instructions. Each delivery is
strictly controlled before leaving the factory. Check the completeness
of the delivery before starting installation. Products represented here
are subject to technical and visual modifi cations! All dimensions
data is in mm. All connection measures are internal measurements!
We are not liable for defects resulting from non-conventional usage,
improper transport or faulty intermediate storage. Our respectively
valid warranty conditions are in force. During mounting protect the
surface of shower tray with cover! Do not put glass panes on rims
or corners!
Caution! Check the delivery for transport damage!
Later claims will not be accepted! The choice of raw
plug and screws depends upon the wall's material!
Water connections
At installation to potable water supply, service technician or
user must connect fi rst a safety device according to local
regulations.
It should be noted that a backfl ow protection device willingly
(EN61770) (VDE 0700 Part 600) in water connection must be
provided by the user.
Penetrations through walls must be sealed with permanently
GB
elastic joint sealant. The installation must be
DIN1988.
The customer must provide a dirt pan in the interior
installation.
We point out that water-softening equipment should be
installed to soften water supplied to the steam generator!
Hot water supply DN 15/20 supply fl ange Rp ½",
recommended fl ow pressure 200-500 kPa, 60-70°C.
Attention: thermal disinfection (short time
temperature increase up to 70°C) should be ensured!
Cold water connection DN 15/20 supply fl ange Rp ½",
recommended fl ow pressure 200-500 kPa.
A ball shut-off valve R ½" shall be provided for both
connections.
Floor drain - connecting pipes DN 50 see point 07.
Wall outfl ow DN 50/40 for steam generator and fragrance
dispencer drainage see point 07.
Wall-concealed siphon included in connection set (Art.-no
27775)
Please note:
during the pipe installation a siphon for wall
mounting (item no. 27775) is required, to ensure an
unproblematic installation of the steam cabin without
shower tray. A siphon for wall mounting is required
for the draining of the steam generator and sent
dispenser!
Electrical installation
For electrical connection please, provide a separate feed
cable see point 02.02 (4m long out of the wall) and a voltage
equalising ground cable 1x4mm², see point 07.
The device must be protected by a separate FI-switch / RCD
(30mA), which disconnects all poles of the system with a
contact opening at least 3 mm wide.
The unit must be connected to the power supply system via
all the poles power cut-off switch (see point 02.02, min. 3mm
opening width, please pay attention to protection areas).
The device must be connected to the mains electricity supply
in accordance with the building regulations using all-pole
disconnecting mains switch.
The device should be connected to electricity only via a fi xed
feed cable according to local regulations. Installation and
repair should be performed only by authorized service.
Note:All electrical work must be performed by a
qualified electrician in accordance with DIN/EN
specifications (DIN VDE 0100-701, etc.), national
regulations and local EVU regulations!
10
01.01 Setting up room for shower tray and
shower enclosure
Separate electrical units that produces steam or moisture
should not be used inside the cabine.
The cabin is designed for setting up in front of the wall.
The gully must be laid in the indicated area.
Observe ceiling height of the room when installing the steam
cabin with platform provided by customer.
Make sure there is a clearance of at least 150mm from the top
of the cabin to the ceiling.
The cabin has been designed for installation on masonry
walls, in order to ensure a reliable fastening.
The walls must be completely tiled over the cubicle's entire
height before the fi tting.
The fl oor at the place of installation must be completely fl at.
When preparing the assembly stand (version D) in the area
of steam cabin a slope for water runoff should be ensured.
The right ground level for glass sheeds fi xing and outside the
cabin for door opening should also be guaranteed. For this
purpose please use the attached template.
For the assembly of the shower tray (version B and C), a
concrete fl oor or a styrofoam carriers can be used. Please pay
rinsed acc. to
attention to the manufacturer's specifi cations. Load capacity of
a minimum 250 kg/m should be guaranteed.
Walls must be vertikal.
For constructional reasons in case of frameless shower
enclosures absolute waterproofness is not possible.
For the safety reasons this device should not be used by
physically and mentally disabled people (and children) or by
people without relevant experience or knowledge, unless they use
it, under supervision of relevant persons or get the instruction how
to use it.
Children should use this product only under adult's supervision.
Attention: due to high temperature within the working
area of steam jet and at steam outlet, direct skin
contact should be avoided.
- warning! Hot surface!
Silicone must be provided by the customer. Please note that
maintenance joints must be cleaned.
02

Equipment

Back walls made of toughened safety glass with EverClean
coating.
Frameless glazing made of toughened safety glass with
EverClean coating.
Roof, made of sanitary-grade acrylic (PMMA) and glass.
Shover tray (optionally) made of sanitary-grade acrylic
(PMMA)
Capacitive integrated control panel.
Steam generator with automatic cleaning and descaling
Nominal voltage 230 V, 50/60 Hz.
Steam jet with blower.
Aroma package, inclusive dispenser.
Fittings (chrome-plated) consisting of:
hand shower, rain shower, kneipp hose, 8 adjustable back
jets, thermostat 1/2˝, 1 closing valve.
Rain shower and back jets electronically operated.
Sound-module consists of MP3-Player (USB-interface),
radio, 2 tweeter speakers and 1 bass speaker.
USB stick with 10 hours of music.
Heating element with a six-step control inclusive temperature
controller,
Rated consumption: 1800 watt, nominal voltage 230 V, 50/60 Hz.
LED-stripe with colour changer in the roof frame.
One stool made of stainless steel and PU seat.

Publicité

loading