General Information; Setting Up Room For Shower Tray And Shower Enclosure - HOESCH SensePerience Instructions De Planification, De Montage Et D'utilisation

Masquer les pouces Voir aussi pour SensePerience:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
01

General information

Hoesch products set the benchmark for quality, comfort and design. To assure optimal function and a long life cycle of
your product please comply with the following instructions. Each delivery is strictly controlled before leaving the factory.
Check the completeness of the delivery before starting installation. Products represented here are subject to technical
and visual modifications! All dimensions data is in mm. All connection measures are internal measurements! We are
not liable for defects resulting from non-conventional usage, improper transport or faulty intermediate storage. Our
respectively valid warranty conditions are in force.
During mounting protect the surface of shower tray with cover!
Do not put glass panes on rims or corners!
Caution!
Check the delivery for transport damage! Later claims will not be accepted!
The choice of raw plug and screws depends upon the wall's material!
Water connections
At installation to potable water supply, service technician or user must connect first a safety device according to
local regulations. It should be noted that a backflow protection device willingly (EN61770) (VDE 0700 Part 600)
in water connection must be provided by the user.
Penetrations through walls must be sealed with permanently elastic joint sealant. The installation must be rinsed
acc. to DIN1988.
GB
The customer must provide a dirt pan in the interior installation.
We point out that water-softening equipment should be installed to soften water supplied to the steam generator!
Hot water supply DN 15/20 supply flange Rp ½", recommended flow pressure 200-500 kPa, 60-70ºC.
Attention: thermal disinfection (short time temperature increase up to 70ºC) should be ensured!
Cold water connection DN 15/20 supply flange Rp ½", recommended flow pressure 200-500 kPa.
A ball shut-off valve R ½" shall be provided for both connections.
Wall outflow DN 50/40 for steam generator drainage - see point 07.
Wall-concealed siphon included in connection set (Art.-no 27775)
Electrical installation
A separate feed cable of 3x2.5mm² ( 2m long out of the wall) and a ground cable 1x4mm² should be provided for
electrical connection (230 V at 50 Hz, 20 A) according to point 07.
The device must be protected by a separate FI-switch / RCD (30mA), which disconnects all poles of the system
with a contact opening at least 3 mm wide. We strongly recommend to connect the unit to power supply system
via all -poles power cut-off switch (20 A, min. 3mm opening width, please pay attention to protection areas).
The device must be connected to the mains electricity supply in accordance with the building regulations using
all-pole disconnecting mains switch.
The device should be connected to electricity only via a fixed feed cable according to local regulations.
Installation and repair should be performed only by authorized service.
Note:
All electrical work must be performed by a qualified electrician in accordance with DIN/EN specifications
(DIN VDE 0100-701, etc.), national regulations and local EVU regulations!

01.01 Setting up room for shower tray and shower enclosure

Separate electrical units that produces steam or moisture should not be used inside the cabine.
The cabin is designed for setting up in front of the wall.
The wall drain must be installed in the indicated area.
Observe ceiling height of the room when installing the steam cabin with platform provided by customer.
Make sure there is a clearance of at least 120mm from the top of the cabin to the ceiling.
The cabin has been designed for installation on masonry walls, in order to ensure a reliable fastening.
The walls must be completely tiled over the cubicle's entire height before the fitting.
The floor at the place of installation must be completely flat.
When preparing the assembly stand (version D) in the area of steam cabin a slope for water runoff should be
ensured. The right ground level for glass sheeds fixing and outside the cabin for door opening should also be
guaranteed. For this purpose please use the attached template.
12

Publicité

Table des Matières
loading

Table des Matières