Step 2:
Position Base Plate
1. Position the edge of Fe
1/2" [13mm] from the inside edge of rim joist.
As shown in Fig. 1 below.
Fig. 1
1/2"
[13mm]
Step 3:
Max Post Spacing
• 6' panel maximum post spacing is 69-3/4" [1772mm].
• 8' panel maximum post spacing is 93-3/4" [2381mm].
Note:
• DO NOT exceed the maximum post spacing.
Fig. 1
6' panel maximum post spacing is 69-3/4"
8' panel maximum post spacing is 93-3/4"
Step 4:
Mount Posts
1. Mark mounting hole locations and pre-drill a 3/8"
[10mm] hole.
2. Insert 3/8" [10mm] x 3-1/2" [89mm] Hex Head galvanized
bolts through 3/8" [10mm] galvanized washer and post
base plate.
Note:
• Post Base Plate holes MUST be positioned a minimum
1/2" [13mm] from edge of deck board.
base plate a minimum of
26
1/2" [13mm]
[1772mm]
[2381mm]
V-SERIES: VERTICAL CABLE INSTALLATION
7