FLAT ACCENT TOP RAIL (ATR) INSTALLATION
Step 1:
Install Flat Accent Top Rail (ATR)
1. Measure the distance between posts.
2. A minimum of two ATR Spacers are required in order to
ensure proper fit of ATR.
3. Transfer that measurement to the ATR and cut a equal
distance from each end of ATR.
4. Test fit the ATR.
5. File any rough edges from cuts and apply zinc based touch
up paint.
6. Apply a quarter sized drop of epoxy to the side walls of
each ATR Spacer. Follow cure times specified on epoxy
packaging. As shown in Fig. 1 below.
7. Install ATR onto rail and wipe away any excess epoxy with a
clean cloth. As shown in Fig. 2 below.
8. Let epoxy cure. DO NOT apply any force to installed ATR for
2 hours.
Fig. 1
ATR
ATR Spacer
Epoxy At Each
Spacer
Fig. 2
Flat Accent Top Rail