Fortress Building Products V Série Instructions D'installation page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Hand tighten the I-Support to the Vertical Support and
position counter sunk hole so that it accessible.
As shown in Fig. 1 below.
Note:
• I-Supports are not required in many locations. Some local
building codes require the following:
For installations that span 24" [610mm] or more,
Fortress Vertical Cable I-Supports are required.
For installations with rails up to 6' [1829mm] one
Vertical Support and I-Support is required.
For installations with rail 6' [1829mm] to 8'
[2439mm] two Vertical Supports and I-Supports are
required.
Fig. 1
5/16" [8mm] Thread
Counter Sunk Hole
Step 2:
Install Panel
1. Install cut panel to ensure proper fit.
Fig. 1
Step 3:
Attach Panel To Bottom & Top Brackets
1. Pre-drill holes for screws using a 3/16" [5mm] drill bit.
2. Apply screws into bottom & top brackets. As shown in
Fig. 1.
V-SERIES: VERTICAL CABLE INSTALLATION
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V-series

Table des Matières