Fortress Building Products V Série Instructions D'installation page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Remove all metal shavings from deck, post base
cover, post, and panel before bracket is screwed to post to
prevent corrosion.
Fig. 1
Fig. 3
Fig. 4
Step 3:
Measure The Panel Opening Length
1. Measure the distance of the panel opening. As shown in
Fig. 1.
2. Confirm that the measurements for the top brackets are
the same as the bottom brackets.
10
V-SERIES: VERTICAL CABLE INSTALLATION
Fig. 2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V-series

Table des Matières