Fortress Building Products V Série Instructions D'installation page 19

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ANGLE BRACKET: BRACKET INSTALLATION
Step 1:
Mark Bracket Hole Locations
1. Mark the centerline of each post with a pencil.
2. Take measurements used in Fig. 1 and 2 to mark bottom
and top bracket hole locations onto posts.
Note:
• Installed panel heights include space between the deck
surface and underside of bottom rail. V-Series has a
spacing of 3-3/4" [96mm].
Fig. 1
Pre-drill Dimensions: Pre-drilling with a 3/16"[5mm] drill bit is required
A*
34" [864mm] Panel
4-5/16" [110mm]
40" [1016mm] Panel
4-5/16" [110mm]
*Dimension A positions bottom edge of rail 3-3/4" [96mm] above deck surface.
*Dimension A is measured from the bottom surface of post base.
Fig. 2
B
Step 2:
Pre-drill Angle Bracket Holes
Tip:
• It's important to double check dimensions to confirm
accuracy of bracket hole locations before drilling.
1. Use the Spring Punch to mark the holes. As shown in Fig. 1.
Bracket Hole Locations
37-3/16" [945mm]
43-3/16" 1097mm]
A
C
V-SERIES: VERTICAL CABLE INSTALLATION
B
1-3/16" [30mm]
1-3/16" [30mm]
A
C
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V-series

Table des Matières