Before making any electrical connections to this
unit, check that the power supply is adequate for
the voltage, amperage, and phase requirements
stated on the rating plate.
NOTE: The rating plate is mounted on the control
box.
A wiring diagram accompanies this manual and is
also attached inside the control box.
U.S. and Canadian installations
The MT3255G requires a 7 Amp, 60HZ, 1Φ,
208-240VAC, 4 wire service consisting of L1, L2,
neutral and ground. Wiring from the power source
to these units must be a minimum of #16 AWG CU.
stranded wire or larger.
Single phase units MUST NOT be connected to
the high leg of a three phase system. The high leg
refers to a potential of 240 volts between one
phase and neutral. The remaining two legs have
a potential of 120 volts between each phase and
neutral.
Connect the four wires at the connections box lo-
cated on the lower left side of the control panel
1. Connect the two black wires to the 208-240
volt power source.
2. Connect the white wire to the system neutral.
3. Connect the green wire to the system ground.
L1
N
Supply
L2
U.S. and Canadian installations
Figure 19
WARNING!!
Incorrect single phase wiring will result in
extensive damage to electrical compo-
nents and possible fire in the control pan-
el.
120
208-240
Oven
120
Installation
General export and Australian installations
The MT3255G requires a 7 Amp, 50Hz, 1Φ,
220-240 VAC, 3 wire service consisting of L1, neu-
tral and ground. Use 90_C wire and size wire ac-
cording to local codes.
Supply
General export installations
THE BLODGETT OVEN COMPANY CANNOT AS-
SUME RESPONSIBILITY FOR LOSS OR DAMAGE
SUFFERED AS A RESULT OF IMPROPER INSTAL-
LATION.
15
Electrical Connection
L1
220-240
N
Oven
Figure 20