Electrical Connection; Connection Of The Supply Line / Start-Up - Helios MiniVent M1/100 N/C Notice De Montage Et D'utilisation

Masquer les pouces Voir aussi pour MiniVent M1/100 N/C:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operation Instructions
DANGER
WARNING
MiniVent M1/100/120 N / C
4. Mounting flange MF 100 (Accessories)
If there are space restrctions in ceilings, in thin walls and in narrow shafts. Attach MF 100 to the wall or ceiling at a
suitable angle (any number possible). Then fasten the fan to the MF 100 with the provided screws (fig. 10/11). Also
suitable for mounting a pull-cord switch (Accessories).
fig.10
MF 100 snap-on
Wall
6.3

Electrical connection

The safety instructions in chapter 1.2 must be observed!
– The electrical connection and initial start-up are to be carried out in accordance with the relevant wiring dia
gram and are only to be carried out by a certified electrician.
– All relevant standards, safety regulations (e.g. DIN VDE 0100), as well as the technical connection conditions
of energy suppliers are to be adhered to!
– A multipole mains section switch/isolator, with a minimum contact opening of 3 mm (VDE 0700 T1
7.12.2 / EN 60335-1) is mandatory!
– Network configuration, voltage and frequency must be consistent with the rating plate information.
6.4

Connection of the supply line / Start-up

– A commercially available NYM line must be used, maximum diameter 11 mm
– Pre-pierce grommet with round tool or pierce directly with supply line (fig.9, Pos
– Remove sheath to100 mm. Strip wires to 7 mm (fig.12)
– Carefully push cable through the grommet
– Place wires in the cable channel and connect according to wiring diagram (page 10)
– Check the waterproofing of the connection cable and tight clamping of the strands
– If the grommet does not evenly enclose the sheathed cable once the supply line is installed, the grommet must be
additionally sealed, e.g. with Silicone N. Otherwise, the IP protection will expire
– The connection cable and the control line must be stored so that no water can get in along the cable in case of
water exposure. The cables must not be placed over sharp edges!
– Check designated use of fan
– Compare mains voltage to rating plate data
– Check fan for solid mounting and professional electrical installation
fig.11
MF 100
12
32
52
9
Ceiling
Ž
)
UK

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Minivent m1/120 n/c

Table des Matières