Blower Motor Installation - Thermador PROFESSIONAL Série Manuel D'installation

Masquer les pouces Voir aussi pour PROFESSIONAL Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Blower Motor Installation

Blower
Remote Blower 600 CFM
Remote Blower 1000 CFM
Remote Blower 1300 CFM
Inline Blower 600 CFM
Inline Blower 1000 CFM
Integral Blower 600 CFM
Integral Blower 1000 CFM
* 20 Amp circuit breaker required when using the VTR1330E Remote Blower with a 27" Pro Wall Hood.
** 15 Amp circuit breaker required when using the VTR1330E Remote Blower with a 24" Pro Wall Hood.
WARNING:
Cutting the plug of the blower will void the warranty or
eligibility for return or exchange.
All hoods require the choice of a Remote, Inline, or Integral
Blower. Use only THERMADOR
THERMADOR ventilation hoods. All blower models are
sold separately. See Table 3 Blower & Circuit Breaker
Ratings for recommended blowers. Contact Customer
Service for additional options.
To reduce the risk of fire and electric shock, install this
range hood only with the blowers listed in Table 3.
All Hood models are rated for 120 VAC, using a 15 amp or
20 amp circuit breaker.
Blower selection will vary based on the volume of air that
needs to be moved and the length and location of the duct
run. For long duct runs with multiple turns and bends,
consider using a more powerful blower. For the most
efficient air- ow exhaust, use a straight run or as few
elbows as possible (refer to "Ductwork Preparation" on
page 4).
For indoor grill installations, THERMADOR recommends a
minimum of 36" (914 mm) clearance to the bottom of the
ventilation unit and Remote or Inline blowers only.
English 12
SKU
VTR630D
600
VTR1030D
1000
VTR1330E
1300
VTI610D
600
VTI1010D
1000
VTN630C
600
VTN1030C
1000
®
blowers with
CAUTION:
CFM
Voltage (AC)
120
120
120
120
120
120
120
Integral Blower Installation Only
1. The blower is attached to the hood using weld studs
provided on the mounting plate. Figure 17 displays the
weld stud locations.
2. Guide the motor mounting plate over the studs.
3. Attach (4) nuts (included with hood) to the weld studs.
Tighten nuts to secure the blower to the hood.
4. Continue to "Wiring the Hood with an Integral Blower"
on page 13.
Blower Current
Circuit Breaker
(AMPS)
4.2
15
5.7
15
8.5
20* / 15**
4.2
15
5.7
15
2.7
15
5.4
15
Table 3: Blower & Circuit Breaker Ratings
Figure 17: Weld Stud Locations
(AMPS)

Publicité

Table des Matières
loading

Table des Matières