GE IM-4A Manuel D'utilisation Et D'installation page 29

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONNECT WATER TUBE
3
TO INLET
Squeeze the ends of the hose clamp (16) from the
kit with pliers and slide the clamp over the inlet,
located in the top right corner of the refrigerator.
(It may be necessary to remove the screw from
the top right condenser mounting clip for better
access to the inlet.)
While still squeezing the clamp, insert the free end
of the water tube (3) into the inlet as far as it will go.
Then slide the clamp downward to capture the
water tube in place.
Using one of the adhesive-backed fasteners (4),
secure the water tube to the back of the refrigerator
about 1/2" below the inlet.
Inlet
16
4
INSTALL WATER LINE CLAMP
4
Attach the water line clamp (strain relief) (6)
from the kit to the refrigerator. With the clamp
directly in line with the water valve, drive the
screw (5) from the kit through the clamp (6)
at the indent into the back of the cabinet.
The metal clamp is for the house water line (see
Water Line Installation Instructions). It is not to
be used for the water tube from the water valve
up to the inlet.
Installation Instructions
3
5
6
ROUTE AND ATTACH
5
THE WATER TUBE
Fasten the water tube to the back of the
refrigerator with adhesive-backed fasteners (4),
spacing the fasteners as shown to take up slack
in the tube. (It may be necessary to remove the
screw from the top right condenser mounting
clip for better access to the inlet.)
WATER VALVE INSTALLED
6
Refer to the Water Line Installation Instructions for
connection to the home water supply. After water
line installation is completed, set the icemaker
power switch to I (on).
The icemaking cycle will not begin until the icemaker
and freezer compartment reach operating temperature,
then icemaking will begin automatically.
29
Adhesive-backed fasteners
for water tube

Publicité

Chapitres

Table des Matières
loading

Table des Matières