Pulling The Load - NORDFOREST 800 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56
Document number | 09.2017
Insert the round sling into the anchor hole between the two housing
plates.
Slide the anchor pin through the anchor hole and the round sling.
Turn the anchor pin twice to secure it.
Secure the anchor pin with the locking cotter pin.

Pulling the load

Danger due to slipping load!
Serious injuries are possible.
Never actuate the T-handle when the load is being pulled.
If the cable winch is overloaded, the shear pin breaks.
i
Observe the cable winch's performance limits (see "Technical
specifications" on page 51).
Anchor the load with the SIKA hook on the end of the rope.
Place the supplied lever pipe on the required lever.
Move the "Forward gear" lever to pull the load forwards.
Move the "Reverse gear" lever to pull the load backwards.
To stop working, no longer pull the levers. The load stops
in its position.
Nordforest 800, 1600 and 3200 kg cable winch
Operating the cable winch
WARNING
45

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

16003200

Table des Matières