Télécharger Imprimer la page

RDI AVALON Instructions Pour L'installation page 5

Masquer les pouces Voir aussi pour AVALON:

Publicité

Les langues disponibles

Les langues disponibles

7.
Once your hinges are installed and gate is
aligned place latch at desired height, and
mark pilot holes onto the gate and the post
(Fig. 8). Pre-drill these marks using a ³/
drill bit.
Attach latch to gate and post using supplied
1" screws (item G from component list).
8.
Use spacer blocks as shown in Figure 8 to
ensure that gate is square and level. On one
side of the gate, extend cross brace along
"
the gate to the opposite upright (noting one
32
side will be adjacent to hinge) to determine
cross brace length (Fig. 9). Mark provided
screw holes with a pencil as shown (Fig. 9
inset). Pre-drill through the marks using a
drill bit and then secure brace together using
the #8 x ³/
" blunt end screws provided (item
8
H from component list).
(Fig. 8)
9.
Attach brace to the uprights. Pre-drill one end
of the brace through the provided screw hole
(Fig. 10). Secure brace to the upright using
the upright using the #8 x ¾" screws provided
(item I from component list). Repeat this step
at the other end of the brace (Fig. 11).
1
/
"
8
(Fig. 9)
(Fig. 10)
(Fig. 11)
5

Publicité

loading