Performance Verification; Equipment Required; Equipment Setup - Tektronix P6245 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Performance Verification

Equipment Required

Table 4- 1: Equipment Required for Performance Verification
Item Description
Oscilloscope
TEKPROBE Power Supply
DC Power Supply
DC Voltmeter
Feedthrough Termination
BNC to BNC coaxial cable
BNC to Banana adapter

Equipment Setup

1. Connect the probe to the oscilloscope.
2. Connect a Y-lead adapter with KlipChip adapters attached to the
P6245.
3. Turn on the oscilloscope and enable the channel.
4. Set the channel's vertical offset to 0.00 V.
5. Turn on the power supply and set to +2.00 VDC.
6. Connect the meter to measure the power supply output.
7. Allow 30 minutes for the equipment to warm up.
P6245 Instruction Manual
Performance
Requirement
TEKPROBE interface
10.00 ±.01 VDC at 1 mA
0.5% accuracy at 2 VDC
50 Ω ± 0.50 Ω
50 Ω coaxial cable
BNC Female to Dual
Banana
Recommended Example
Tektronix TDS 684A
Tektronix 1103
Tektronix PS281
Tektronix CDM250
011--0129--00
012--1342--00
103--0090--00
4- 5

Publicité

Table des Matières
loading

Table des Matières