Starting Operation - Bosch GDB 350 WE Professional Notice Originale

Masquer les pouces Voir aussi pour GDB 350 WE Professional:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
Clean the core bits before inserting them. Lightly grease the
thread of the core bit or spray it with corrosion inhibitor.
Screw a 1 1/4" UNC core bit (6) onto the drill spindle (7).
Check that the core bit is fitted securely. Core bits that
u
are attached incorrectly or are not securely fixed in place
may come loose during operation, thereby putting you at
risk.
Removing the core bit
Wear protective gloves when changing the core bit.
u
The core bit may become hot when the power tool is op-
erated for extended periods of time.
Detach the core bit (6) using an open-ended spanner (width
across flats 41 mm). When doing so, hold a second open-
ended spanner (width across flats 32 mm) on the two flats
of the drill spindle (7) to provide counterforce.
The easy-release element (8) makes it easier to remove the
core bit (6).
Connecting the water cooling system
If wet core bits are not kept sufficiently cool during drilling,
the diamond segments can become damaged or the core bit
can get stuck in the drill hole. It is therefore important to en-
sure a sufficient feed of water when wet-drilling.
When expanding an existing hole, this must be sealed care-
fully to allow the core bit to be sufficiently cooled.
Connected hoses, shut-off valves or accessories must
u
not interfere with drilling.
Close the water cutoff valve (5). Connect a water supply line
to the valve adapter (4). The water supply line can be
provided from a mobile pressurised water tank (accessory)
or a stationary water connection.
You will need a water collection ring and a wet/dry extractor
(both accessories) to collect the water that escapes from the
drill hole during wet drilling.
Fitting a water collection ring for water extraction
(see figure F)
The water collection ring (see "Accessories/replacement
parts", page 23) is intended for use with the drill stand for
diamond drills GCR 350 and the diamond drill
GDB 350 WE.
Cut an opening for the required drilling diameter in the seal-
ing cover.
Push the tension spring (35) as far as possible into the gap
between the base plate (19) and drill column (21). Make
sure that the angled section of the tension spring is facing
downwards.
Put the water collection ring in position and place the ten-
sion spring on the contact points on the water collection
ring. (The lugs on the ends of the tension spring are used to
pull the tension spring upwards.)
The tensioning force of the spring will press the water collec-
tion ring with its seal onto the surface. Together with the va-
cuum of the wet/dry extractor, this will prevent water from
escaping.
Bosch Power Tools
The water collection ring can be turned inside its tension ring
in order to put the extraction outlet in the necessary position
(e.g. to optimise the water drainage when drilling holes hori-
zontally). To do so, open the lock of the tension ring on the
water collection ring, turn the water collection ring as re-
quired and close the lock again.
Operation
Changing the drilling angle
Pull the plug out of the socket before carrying out any
u
work on the power tool.
Always retighten all the screws after making adjust-
u
ments to the drill stand.
Loosen the cap nut (17) using the star handle (15).
Set the drill stand to the required drilling angle using the
drilling angle scale (13). Refer to the arrow next to the cap
nut (17) to set it exactly.
Tighten the cap nut (17) hand-tight using the star
handle (15).
The drill stand must not be inserted until the cap nut
u
(17) of the angle adjustment has been retightened.

Starting operation

Pay attention to the mains voltage. The voltage of the
u
power source must match the voltage specified on the
rating plate of the power tool.
Seek advice from the responsible structural engineer,
u
architect or construction supervisor regarding
planned drill holes before starting work. Do not penet-
rate any reinforcements unless you have authorisa-
tion from a structural engineer.
When drilling holes that penetrate walls or ceilings, al-
u
ways check the area concerned for obstacles. Close
off the work site and prevent the drill core from falling
by means of formwork.
Function test of the portable residual current device
(PRCD)
Before starting work, always check that the portable residual
current device (PRCD) (1) is functioning correctly:
– Press the TEST button on the residual current device
(PRCD). The red indicator light will switch off.
– Press the RESET button. It must now be possible to
switch the power tool on.
If the red indicator light does not switch off when you press
the TEST button or it switches off repeatedly when the
power tool is switched on, you must have the power tool
checked by an authorised Bosch after-sales service centre.
The power tool must not be used if the portable resid-
u
ual current device (PRCD) is defective.
Switching on
Press the RESET button on the portable residual current
device (PRCD) (1).
Set the water cutoff valve (5) to flow.
English | 21
1 609 92A 4NK | (03.04.2019)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gcr 350 professionalGdb 350 weGcr 3500601189900

Table des Matières