Télécharger Imprimer la page

Mantel Iron; Convection Connection; Possible Connections; Preparations For The Installation Of The Combined Inlet-Outlet System - Dru ESTATE 02 Instructions D'installation Et Mode D'emploi

Publicité

Les langues disponibles

Les langues disponibles

INSTRUCTIONS FOR INSTALLATION
Installing the appliance in a new fireplace
Position the fire at the right height. Use the adjustable
feet to adjust the height of the appliance. Connect the fire
and finish the fireplace.

Mantel iron

An L-shaped mantel Iron can be ordered from your
installer.The mantel Iron, intended to support the
brickwork above the fire.This enables a stress-free
installation of the appliance. Fit the mantel iron as
illustrated in fig. 3, allowing 5 mm between the top of the
appliance and the bottom of the mantel iron, so that the
packing cord provided seals adequately. Make sure that
the front of the heater (without the decorative facing)
and the front of the mantel iron are flush. Fitting the
decorative facing will hide the mantel iron from sight.

Convection connection

Figures 1 and 2 also show the possibility of a convection-
heat connection.
The convection system of flexible pipes will enable the
heat to be spread to every corner of the room.The
connection materials can be ordered separately from
your dealer.
Possible connections (fig. 4)
The external duct can pass through either the wall or the
roof; the connections to both supply and flue pipes
should meet the following requirements:
1
2x45º
L=1+2+5+(2x1)=10
3
• The first metre of pipe should always be fitted vertically,
except example 4 in fig. 4.
• The horizontal length of pipe should never be more than
3 metres and a wall duct.
• The maximum length of vertical pipe is 12 metres.
Allow 2 metres for a bend of 90° and 1 metre for a 45°
bend.There is no need to allow for the length of the wall
or roof duct.
The maximum total length is the sum of the pipe lengths
plus the substitute length for the bends (see the four
examples in fig. 4).
The roof duct set, the supply and flue pipes, the
concentric pipe and bends are packed separately and
supplied together with a clip binding with sealing ring.
Tile flashing or adhesive flashing is also available for use
with a duct through a slanting or flat roof respectively.
NB: This appliance may only be installed using the flue
material ø150/ø80 supplied by DRU.This has been
approved together with the appliance to comply with all
requirements. DRU cannot guarantee that the appliance
will work correctly and safely if alternative installation
material is used.
Preparations for the installation of the
combined inlet-outlet system
• Select the required connection from the options shown
in figure 4.
• Erect the concentric pipes from the heater up. If the
2x90º
2
L=1+1+4+(2x2)=10
(H total= 5m)
4
1x90º
L=3+1,4+(2)=6,4
max 3m
fig. 4
11
1m
38c-744c
Estate / Castello

Publicité

loading

Ce manuel est également adapté pour:

Castello 02C11C31