Installation; Necessary Tools; Initial Conditions And Checks - Erreka ABC2M-009 Manuel De L'installateur

Cadre de manoeuvre pour l'actionneur "bul"
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ABC2M-009_ES_FR_EN_PT_DE.book Page 44 Thursday, April 17, 2008 9:43 AM

INSTALLATION

1

NECESSARY TOOLS

Set of screwdrivers
Marker pencil
Tape measure
2

INITIAL CONDITIONS AND CHECKS

Initial installation conditions
Ensure the operator is correctly installed in the
gate.
It is necessary to have an earthed 230Vac, 50Hz,
current connection.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
Ensure the current connection and installation
fulfil the following requirements:
• The nominal voltage of the installation must
coincide with that of the control panel.
• The installation must be able to support the
power consumed by all the automat
devices.
• The installation must be earthed.
44
Installation manual
Electric drill and broaches
Use the electrical drill in line with the use
instructions.
For proper operation, it is essential that the in-
ground central stop is in the gate closed position.
In order to program the travel of the gate, there
should also be mechanical stoppers in the gate open
position.
Check that the admissible environmental
temperature range for the control panel is
suitable for the location.
• The electrical installation must comply with
low voltage regulations.
• The installation elements must be properly
secured and in a good state of conservation.
• The current connection point must be high
enough to be out of the reach of children.
If the electrical installation does not comply
with the foregoing requirements, repair before
installing the automatic gate.

Publicité

Table des Matières
loading

Table des Matières