Connection And Startup; Mechanical Connection; Mounting Data; Transport And Storage Conditions - Siemens SIMOTICS M-1PH8 Série Instructions De Service / Instruction De Montage

Moteurs principaux
Masquer les pouces Voir aussi pour SIMOTICS M-1PH8 Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

K3G250-RR03-M4
Siemens AG DI MC + LD
With regard to cyclic speed loads, note that the rotating parts of
the device are designed for a maximum of one million load
cycles. If you have special questions, consult ebm-papst for
support.
; Use the device in accordance with its degree of protection.
Information on surface quality
The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may change during the production period.
This has no effect on strength, dimensional stability and dimensional
accuracy.
The color pigments in the paints used perceptibly react to UV light over
the course of time. This does not however in any way affect the
technical properties of the products. The product is to be protected against
UV radiation to prevent the formation of patches and fading. Changes in
color are not a reason for complaint and are not covered by the warranty.

3.5 Mounting data

Strength class of
8.8
screws
; Secure the screws against unintentional loosening (e.g. use self-
locking screws).
Any further mounting data required can be taken from the product
drawing or Section Chapter 4.1 Mechanical connection.

3.6 Transport and storage conditions

Max. permitted
+80 °C
ambient temp. for
motor (transport/
storage)
Min. permitted
-40 °C
ambient temp. for
motor (transport/
storage)

3.7 Electromagnetic compatibility

EMC immunity to
According to EN 61000-6-2 (industrial
interference
environment)
EMC circuit feedback
According to EN 61000-3-2/3
EMC interference
According to EN 61000-6-3 (household
emission
environment)
If several devices are connected in parallel on the supply side
so that the line current of the arrangement is in the range 16 - 75
A, this arrangement conforms to IEC 61000-3-12, provided that
the short-circuit power S
customer system to the public power grid is greater than or
equal to 250 times the rated output of the arrangement. It is the
responsibility of the installation engineer or operator/owner of the
device to ensure, if necessary after consultation with the
network operator, that this device is only connected to a
connection point with an S
times the rated output of the arrangement.
272
Item no. 55691-5-9970 · ENU · Change 211092 · Approved 2020-05-20 · Page 6 / 13
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com
Operating instructions
sc at the connection point of the
sc value greater than or equal to 250

4. CONNECTION AND STARTUP

4.1 Mechanical connection

CAUTION
Risk of cutting and crushing when removing device
from packaging
→ Carefully remove the device from the packaging by grasping
hold of the frame. Never subject to any impact.
→ Wear safety shoes and cut-resistant safety gloves.
CAUTION
Heavy load when unpacking device
Risk of physical injury, such as back injuries.
→ Two people should work together to remove the device from
its packaging.
NOTE
Damage to the device from vibration
Bearing damage, shorter service life
→ The fan must not be subjected to force or excessive vibration
from sections of the installation.
→ If the fan is connected to air ducts, the connection should
be isolated from vibration, e.g. using compensators or similar
elements.
→ Ensure stress-free attachment of the fan to the
substructure.
; The fan may not be handled in the area around the inlet nozzle during
transport and installation.
There is a risk of damage to the impeller.
; Check the device for transport damage. Damaged devices are not to
be installed.
; Install the undamaged device in accordance with your application.
CAUTION
Possible damage to the device
If the device slips during installation, serious damage can result.
→ Ensure that the device is securely positioned at its place of
installation until all fastening screws have been tightened.
The fan must not be strained on fastening.

4.2 Electrical connection

DANGER
Voltage on the device
Electric shock
→ Always connect a protective earth first.
→ Check the protective earth.
DANGER
Faulty insulation
Risk of fatal injury from electric shock
→ Use only cables that meet the specified installation
regulations for voltage, current, insulation material, capacity,
etc.
→ Route cables so that they cannot be touched by any
rotating parts.

Publicité

Chapitres

Table des Matières
loading

Table des Matières